Flooding update: 2 hrs in and keeping pace with the last time I did it from what I can tell as the water is touching the whole back wall (closest in picture). Later this afternoon I probably need to get the braces pounded in place.

A large, rectangular ice rink is under construction, with water contained by white plastic sheeting. It’s set in a grassy backyard, surrounded by trees and adjacent houses.